The construction of a pumped storage hydroelectric system at Hatta, Dubai, by Dubai Electricity & Water Authority (DEWA)

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The project will be completed in Phases. The instruction for Phase 1 are as follows:

You are required to select a specific Engineered System in any program/project that is a real case or future innovative idea for a system that shall serve the UAE.

you are required to upload your finding in this assignment to include the following:

1.  The problem statement that lead to the initiation of using that specific engineered system in the project/program.

2.  Overview of the project/program including all systems cost, and duration (schedule).

3.  Present the System’s Work Breakdown Structure (SWBS) down to the 3ed or 4th level if possible. 

4.  Using the SWBS, List all the objectives in a structured tree format.  This is going to be under a header called (Objectives Analysis).

5.  Show your references.

NB: I am going to upload a project sample that shows all phases. So, only refer to the relevant sections that correspond to Phase 1.

Remember, List all the references used.

Live Chat+1(978) 822-0999Email